Oroville Chamber of Commerce
  • Home
  • Directory
  • Events
    • Calendar
    • Signature Events
  • Visit
    • Visit Oroville
    • Lake Oroville
  • Membership
    • Member Login
    • Benefits
    • Advertising Value
    • Join Chamber
    • Business Catalogs
    • Advertising Value Report
    • Chamber’s Welcome Center
  • About Us
    • Contact
    • The Chamber
    • Board of Directors
    • Ambassadors
    • Chamber Staff
    • News Blog

Blog | News

Lake Oroville Community Update - April 26

5/1/2019

 
Picture
April 26, 2019Oroville Operations and Main Spillway UpdateCORRECTION: In our earlier notification, we stated that repaving operations on area roadways will be underway Monday to Friday through May 29. Paving will also take place this Sunday April 29 and on Saturdays through the end of May.
Oroville’s current reservoir elevation is 877 feet, an increase of 10 feet from last week. Total releases to the Feather River have also increased slightly to 10,500 cubic feet per second (cfs). Oroville’s operations plan is designed to safely accommodate inflows from the above average snowpack, and DWR is aiming to keep lake levels high through spring and summer. Currently, releases from the Hyatt Powerplant are adequate to meet operational requirements of the reservoir and there is no need to use the main spillway at this time. However, we may need to use the main spillway again this year to manage inflows from increased snow melt. DWR will notify the public and media of any planned use of the main spillway.
The main spillway performed as designed when it was used April 2 through April 10, with releases topping out at 25,000 cfs. DWR engineers will continue to perform a thorough inspection of the main spillway to further evaluate its performance and will continue to be visible on the spillway structure. Water currently seen on the spillway results from normal seepage through the spillway radial gates, which are not designed to be watertight. Sandbags are used to direct the flow of water to one side of the spillway or the other to allow for safe access by DWR engineers.
DWR contractors have begun repaving operations on the Oroville Dam Crest Road, the Spillway Boat Launch facility and other area roadways. Paving construction vehicles will continue to use Hyatt Access Road through May 29. Motorists and residents should anticipate additional construction traffic on Canyon Drive and on Oro Dam Blvd. East to the Hyatt Access Road Monday through Friday from 6 a.m. to 6 p.m. We apologize for any inconvenience and will notify you if there are any changes. Thank you for your continued patience.
###
For more information, follow us on Twitter or Facebook and read our news releases and DWR updates.

Comments are closed.

    Archives

    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    June 2018
    May 2018
    April 2018

    Categories

    All
    Arbor Day Festival
    Attractions
    Business Tip
    Chamber
    Dine & Drink
    Dining
    Events
    Hike & Bike
    Historical
    Local
    Lodging
    Member
    Member Spotlight
    Outdoor Activities
    Point Of Interest
    Press Release
    Recreation
    Visit Oroville

    RSS Feed

Contact

We look forward to hearing from you!
1789 Montgomery St.
Oroville, CA 95965
(530) 538-2542

Send a message »

Hours & Info

We are open Monday–Friday 9AM–3PM.

Categories

Directory

Calendar

Visit Oroville

Lake Oroville

Membership

About Us

 News Blog

    Subscribe to Our Newsletter

    Join our mailing list to receive the latest news and updates from our team.
Subscribe to Newsletter
© Copyright 2019. Oroville Area Chamber of Commerce. All rights reserved.  |   Chamber Technology by Chamber Nation   |    Privacy Policy
  • Home
  • Directory
  • Events
    • Calendar
    • Signature Events
  • Visit
    • Visit Oroville
    • Lake Oroville
  • Membership
    • Member Login
    • Benefits
    • Advertising Value
    • Join Chamber
    • Business Catalogs
    • Advertising Value Report
    • Chamber’s Welcome Center
  • About Us
    • Contact
    • The Chamber
    • Board of Directors
    • Ambassadors
    • Chamber Staff
    • News Blog